Before house raise at Geebung
House raised into position (Lifted 700mm)
75 x 75 x 4 shs steel posts installed
Steel beams installed – job finished
Stumps installed in a removal house – Mitchelton Steel beams installed – job finished
Steel beams installed – job finished
Before house lift – Kedron
House lifted into position (Lifted 900mm)
Steel beams and posts installed – front view
Steel beams and posts installed – rear view
Before house raise – Daisy Hill
House raised into position (Lifted 1000mm)
View of under a raised house
View of house raising stacks
100 100 x 4 shs steel posts installed
Steel beams installed – job finished
Before house move and raise at Wilston
House moved right (1200mm)
House lifted into position (Lifted 900mm)
75 x 75 x 4 shs steel posts installed – job finished
Before house raise in Petrie
House lifted into position (Lifted 1000mm)
Underneath of house lifted into position
Rear view of house lifted into position
Before house raise – York St, Geebung
House raised approx. 1200mm
Posts and beams installed to subfloor
House raise and restump completed
House in Stafford ready for slide
House moved left 1500mm, lifted 1200mm
Rear view of house in Stafford
House raise and restump completed
Before house raise in Keperra
House lifted 2300mm
Steel beams and posts installed
House raise and restump completed